During the construction of the canopy on the top floor of the XX building in XX city, water entered the elevator, and the elevator involved in the case was later found to be damaged.
Our company was entrusted by the court to investigate the cause of the damage to the escalator located in the XX building in XX city in this case. Make an identification.
appraisal analysis results: The
quality analysis expert group discussed and comprehensively analyzed the relevant information, on-site investigation and inspection data of the "concrete telephone pole" involved in the case, and made the following quality analysis opinions:
1, 1 elevator (8#) involved in the case, the bottom of the upper and lower control rooms The plate is severely corroded, and there are traces of water stains on the surface of the pedal (left and front sides), bottom plate and protective plate. The upper and lower parts cannot operate normally during emergency stop and forward and reverse actions. The cause of the damage is the upper emergency stop button, upper inspection socket, and upper stop button. These components are related to water intrusion inside the elevator;
2, Elevator involved in the case (1#, 2#, 5#, 6#, 7#) 5 The emergency stop action and forward and reverse action of the upper and lower parts are running normally;
3, 2 elevators (3#, 4#) involved in the case, the on-site applicant confirmed that the elevator can operate normally.