According to the "clean factory" investigation information provided by the client and the client's description, the 10,000-level dust-free workshop invested and constructed by a company is suspected of having the following problems: the design drawings do not meet the requirements of national standards; the current situation of the factory does not match the design drawings; the supporting clean equipment or facilities do not meet the basic requirements for the 10,000-level dust-free workshop. It is suspected of cutting corners, making false declarations, and defrauding the local government of huge financial subsidies. In order to clarify whether the "clean factory" involved in the case can meet the cleanliness level of 10,000, the client proposed to conduct quality appraisal of the "clean factory" involved in the case.
Appraisal analysis results:
The appraisal expert group discussed and comprehensively analyzed the relevant information, on-site inspection and recorded data of the "clean factory" involved in the case, and made the following appraisal opinions:
1. The design drawings of the "clean factory" involved in the case do not comply with national standards According to the accurate requirements, the cleanliness level of the clean factory built according to the design drawing cannot reach the level of 10,000-level cleanliness;
2, the current situation and design of the "clean factory" involved in the case
03, the cleanliness level of the "clean factory" involved in the case cannot reach the 10,000-level cleanliness standard agreed upon in the design drawings. 1234