Meter quality appraisal

Meter quality appraisal-Electronics & Electrical Appliances-CAS Testing Technical Services (Hong Kong) Company Limited

Meter qualityAppraisal Background

Electric energy meter is also an electric meter, commonly known as electricity meter. According to the number of power phases, it is divided into two categories: three-phase and single-phase. Among them, three-phase electric energy meters are divided into two types: three-phase four-wire system and three-phase three-wire system.
Household electricity meters are generally single-phase electricity meters. Currently, single-phase electronic energy meters, or single-phase smart electricity meters, are becoming more and more popular. Compared with single-phase induction energy meters, they have higher accuracy, lower power consumption, smaller starting current, wider load range, and no mechanical wear and many other advantages.
In the case of electric meter quality appraisal, Zhongke Testing can provide electric meter quality appraisal services.

Meter qualityAppraisal Scope

1, divided according to structure and principle: induction energy meter, electronic energy meter.
electronic energy meters can further be divided into fully electronic energy meters and mechanical and electrical engineering pulse energy meters.
2, divided according to accuracy level:
ordinary: 0.2S, 0.2, 0.5S, 0.5, 1.0, 2.0, 3.0 levels, used to measure electrical energy.
high precision level: 0.01, 0.05 level, mainly used as the calibration standard for calibrating ordinary electric energy meters.
3, divided by application fields:
active power energy meter, reactive power energy meter, maximum demand meter, interest rate energy meter, multi-purpose energy meter, AC energy meter and DC energy meter, single-phase energy meter, three-phase three-wire energy meter and three-phase four-wire energy meter.

Meter qualityAccreditation criteria

GB/T 17215.211-2006 Alternating current measuring equipment General requirements Tests and test conditions Part 11: Measuring equipment
GB/17215.321-2008 Alternating current measuring equipment Special requirements Part 21: Static active energy meters (Class 1 and 2)
GB/17215.322-2008 Alternating current measuring equipment Special requirements Part 22: Static active energy meters (Class 0.2S and 0.5S)
GB/17215.323-2008 Alternating current measuring equipment Special requirements Part 23: Static reactive energy meter (level 2 and level 3)
GB/17215.301-2007 Multifunctional energy meter Special requirements

Meter qualityAuthentication case

1. Cause: The supply and demand parties signed a contract. When the supplier inspected the "electricity meter" involved, it was found that the A-phase voltage and C-phase voltage of the "electricity meter" involved were incorrectly wired, resulting in the electric energy metering device under-metering the amount of electricity. In order to find out whether there is a wiring error in the "electricity meter" involved in the case, and if there is a wiring error, to confirm the starting time of the supplement and the amount of electricity to be supplemented, it is necessary to submit a request to the court for quality appraisal of the "electricity meter" involved in the case.
2. Process: Our company organized an expert team to carry out two on-site inspections, and witnessed the entire process with both supply and demand parties. The supplier's technical staff read the meter data involved in the case from the backend system of the power grid, copied the "Account Data" file and brought the meter involved back for further analysis.
3. Result: The appraisal expert group conducted a discussion and comprehensive technical analysis on the relevant information, on-site investigation and test data of the "electricity meter" involved, and gave the following appraisal opinions:
1) The "electricity meter" involved in the case had wiring errors from **month **** to **month ****, which caused abnormal power consumption;
2) The amount of electricity that should be supplemented by the "electricity meter" involved in the case from **month **** to **month **** is 2148981.42148793.92436411.1kWh.